Planning a Kitchen Renovation Timeline

From first measurement to final install, here is a realistic sequence for a kitchen renovation and where the delays actually come from.

Emily Carter2 min read
Cabinets installed ahead of countertop templating
A completed run of wall cabinets

The sequence

  1. Design and measure. Layout, appliance selection, and a full set of measurements. Nothing is ordered yet.
  2. Order cabinets. Built to order, so this is where the lead time sits.
  3. Demolition. Strip the old kitchen; confirm the measurements against the bare walls.
  4. Rough-in. Plumbing, electrical, and any structural work. Under-cabinet lighting is wired now or never.
  5. Floors and walls. Flooring, drywall repair, and priming, before anything is fixed to them.
  6. Cabinet install. Base cabinets levelled to the high point of the floor, then wall cabinets, then fillers and end panels.
  7. Countertop template. Only after the cabinets are in and level. Templating from a drawing rather than the installed run is a common and expensive error.
  8. Countertop install, then sink, cooktop, and plumbing connections.
  9. Backsplash, hardware, and appliances.
  10. Snagging. Door alignment, drawer adjustment, touch-ups.

Where the delays come from

Two steps dominate the schedule, and both involve waiting rather than working: the cabinet build, and the gap between countertop templating and installation. Neither can be compressed by adding people.

Everything else is sequencing. A trade that arrives out of order — flooring before rough-in, backsplash before the countertop — costs days, not hours.

Two things that save weeks

Order the appliances early. They set the cabinet dimensions, and a back-ordered range can hold up templating.

Don't demolish until the cabinets have a confirmed delivery date. A kitchen you can't use is a much worse place to wait than a kitchen you're about to replace.